Pasco High School

Selective & Building Demolition--Summer 2007

TCS Home     Demolition Home

 

We had to demolish this boiler building.  It had a deep basement.

Nakia loading remnants of the boiler building.

 

We left our "security" door for last.

 

We had to sawcut the concrete roof overhang in preparation for the new addition.

 

Charlie grabs his umpteenth load for a trip to the recycler.

 

Our Brokk robots travel with us.

 

We had to strip the ceilings in all of the racquetball courts.

 

George enjoying summer in Pasco.

 

Preparing to make a huge opening between two courts, George finishes a vertical cut.

 

Then Nakia does the horizontal cut.

 

The general contractor was impressed with the ingenious way we demolished the concrete.  There was zero collateral damage.