TALISMAN CONSTRUCTION SERVICES, INC.
Villa Italian Kitchen
Spokane Valley Mall Food Court
Selective Demolition
TCS Home Demolition Home
Before demolition. The GC will have a temporary wall built before we start work.
The front half of the space was stripped to a shell.
The ceiling required some temporary supports after we removed the sloped menu wall.
The floor tile removal was more difficult than anticipated due to the discovery of an unusual membrane.